Vegetation control and deforestation works on the Railway Infrastructure, over a length of 962km of railway track from Vale de Santarém to Vila Real de Santo António. The main objective of these works is to promote a strategy of vegetation control maintenance that ensures adequate standards for the safety conditions of railway traffic, railway track visibility, particularly at track crossings, fire protection strips, the amount of combustible material in the areas under bridges, under viaducts, as well as adequate conditions for the intervention of teams in case of need.

Local: Vale de Santarém to Vila Real de Santo António